The experience shows that the collapse degree of the concrete that did not add water reducing agent in 1 hour loss is less than the concrete that add water reducing agent, cause this kind of "strange" the main reason of the phenomenon is that the concrete still needs to experience mixing system, transportation and pouring after adding water reducing agent.
Therefore, it is necessary to add water to restore the collapse degree of concrete mixed with water-reducing agent in the concrete construction site. However, this method will significantly reduce the concrete properties such as strength, which may lead to concrete cracking, hardening and other abnormal phenomena.
In order to solve the problem of concrete collapse loss by adding water reducer effectively, it is suggested that the workers should use the method of adding water reducer in batches and the method of adding water reducer later.
In the above methods, batch component mixing method can not only effectively avoid the loss of concrete collapse degree, but also control the production cost to a certain extent and maximize the benefits of concrete construction.